Our Projects

Learn more about our wind, solar and storage assets in Ireland

Powering Ireland with clean energy

We currently have 20 onshore wind farms in operation across Ireland, producing 373 MW of clean energy – the equivalent of powering 250,000 homes. We also have a pipeline of projects at various stages of development. Find out more about our presence in Ireland.

In operation

Across Ireland, our team has been managing operational wind farms since 1997. We are proud to operate these assets in communities the length and breadth of the island of Ireland. 

booltiagh 1 wind farm

Booltiagh 1 Wind Farm

Location: 15 km west of Ennis, County Clare, Republic of Ireland, along with Booltiagh 2
Number of turbines: 12
Installed capacity: 18 MW
In commercial operation since: October 2005

booltiagh 2 wind farm

Booltiagh 2 Wind Farm

Location: 25 km north-west of Cashel, County Tipperary, Republic of Ireland, on the same site as Booltiagh 1
Number of turbines: 6
Installed capacity: 12 MW
In commercial operation since: September 2013

garracummer & mienvee wind farm

Garracummer Wind Farm

Location: 25 km north-west of Cashel, County Tipperary, Republic of Ireland
Number of turbines: 17
Installed capacity: 42.5 MW
In commercial operation since: March 2013

gneeves wind farm

Gneeves Wind Farm

Location: 6 km south-west of Millstreet, County Cork, Republic of Ireland
Number of turbines: 11
Installed capacity: 9.4 MW
In commercial operation since: June 2006

inchincoosh wind farm

Inchincoosh Wind Farm


Location: 7 km north of Kilgarvan village in County Kerry, Republic of Ireland (extension of Kilgarvan, along with Sillahertane)
Number of turbines: 13
Installed capacity: 32.5 MW
In commercial operation since: June 2009

kilgarvan wind farm

Kilgarvan Wind Farm

Location: 7 km north of Kilgarvan, County Kerry, Republic of Ireland
Number of turbines: 15
Installed capacity: 45 MW
In commercial operation since: November 2007

knockawarriga 1 wind farm

Knockawarriga 1 Wind Farm

Location: 12 km south-east of Abbeyfeale in County Limerick, Republic of Ireland
Number of turbines: 9
Installed capacity: 22.5 MW
In commercial operation since: August 2008

knockawarriga 2 wind farm

Knockawarriga 2 Wind Farm

Location: 12 km south-east of Abbeyfeale in County Limerick, Republic of Ireland
Number of turbines: 3
Installed capacity: 7.5 MW
In commercial operation since: January 2020

lisheen 1 wind farm

Lisheen 1 Wind Farm

Location: 10 km east south-east of Templemore, County Tipperary, Republic of Ireland
Number of turbines: 18
Installed capacity: 36 MW
In commercial operation since: September 2009

lisheen 2 wind farm

Lisheen 2 Wind Farm

Location: 10 km east south-east of Templemore, County Tipperary(extension of Lisheen1)
Number of turbines: 12
Installed capacity: 24 MW
In commercial operation since: June 2013

garracummer & mienvee wind farm

Mienvee Wind Farm

Location: Holyford, County Tipperary, Republic of Ireland, within Garracummer wind farm
Number of turbines: 1
Installed capacity: 0.9 MW
In commercial operation since: October 2004

sillahertane wind farm

Sillahertane Wind Farm

Location: 7 km north of Kilgarvan, County Kerry, Republic of Ireland (extension of Kilgarvan, along with Inchincoosh)
Number of turbines: 10
Installed capacity: 8.5 MW
In commercial operation since: June 2009

ballymartin wind farm

Ballymartin Wind Farm

Location: 7 km west of Mullinavat, County Kilkenny, Republic of Ireland, alongside the Smithstown wind farm
Number of turbines: 3
Installed capacity: 6.9 MW
In commercial operation since: June 2011

lisheen 3 wind farm

Lisheen 3 Wind Farm

Location: 3 km west of Crosspatrick village, spanning County Laois and County Kilkenny (extension of Lisheen 1 & 2)
Number of turbines: 8
Installed capacity: 28.8 MW
In commercial operation since: March 2023

smithstown wind farm

Smithstown Wind Farm

Location: County Kilkenny, Republic of Ireland
Number of turbines: 4
Installed capacity: 8 MW
In commercial operation since: August 2013

ballykeel wind farm

Ballykeel Wind Farm

Location: 4km west of Larne, Co. Antrim
Number of turbines: 7
Installed capacity: 16 MW
In commercial operation since: June 2023

flughland wind farm

Flughland Wind Farm

Location: 44km west of Letterkenny, Co. Donegal, close to Sorne 1 and Sorne 2
Number of turbines: 4
Installed capacity: 9.2 MW
In commercial operation since: August 2009

owenreagh 2 wind farm

Owenreagh 2 Wind Farm

Location: Co. Tyrone, Northern Ireland
Number of turbines: 6
Installed capacity: 2.6 MW
In commercial operation since: 2008

sorne 1 & 2 wind farms

Sorne 1 Wind Farm

Location: 9 km east of Buncrana, County Donegal, Republic of Ireland, together with Sorne 2, close to Flughland 
Number of turbines: 16
Installed capacity: 32 MW
In commercial operation since: January 2006

sorne 1 & 2 wind farms

Sorne 2 Wind Farm

Location: 9km east of Buncrana, County Donegal, Republic of Ireland, close to Flughland (extension of Sorne 1)
Number of turbines: 3
Installed capacity: 6.9 MW
In commercial operation since: January 2009

In construction

picture: michael o'sullivan / osm photo

Farranrory Wind Farm

Location: County Tipperary
Total installed capacity: Up to 9 turbines and 45-50MW
Target to enter commercial operation in:
 2026

de 20 solar altenschwand

Ballinrea Solar Farm

Location: Between Cork City and Carrigaline
Total installed capacity: 55MW
Target to enter commercial operation in:
2027

Ørsted carlow sf may 25 update photos 1 compressed (1)

Garrenleen Solar Farm

Location: County Carlow
Total installed capacity: 81MW (Phase 1)
Target to enter commercial operation in:
 2026

In development

Ballinagree Wind Farm

Status: Pre-construction
Location: County Cork
Capacity: 106.4MW (joint venture with FuturEnergy Ireland)

Brittas Wind Farm

Status: In planning process
Location: County Tipperary
Capacity: 57MW to 66MW

Cappakeel Solar

Status: In planning process
Location: County Laois
Capacity: 170MW

Coom Green Energy Park

Status: Pre-construction
Location: County Cork
Capacity: 105.6MW (joint venture with FuturEnergy Ireland)

Craignagapple Wind Farm

Status: In planning process
Location: County Tyrone
Capacity: 63-67 MW (repower)

Greenhills Solar

Status: In development
Location: County Cork
Capacity: 250MW

Oatfield Wind Farm

Status: In planning process
Location: County Clare
Capacity: 66MW 

Delamain Solar

Status: In planning process
Location: County Kildare
Capacity: 200 MW

Lodgewood Solar

Status: In planning process
Location: County Wexford
Capacity: 109 MW

Rathcoursey Solar

Status: In planning process
Location: County Cork
Capacity: 100 MW

Repowering

The average lifespan of a wind turbine is 20-25 years – meaning many of Ireland’s early wind farms are now reaching the end of their operational life. But what happens to the wind farm after this? Repowering is the next step for many renewable energy developers. This means replacing ageing turbines with fewer, taller, more efficient models that can generate significantly more electricity from the same sites.

Kilgarvan Repower

Perigus Energy is in the process of developing a new renewable energy proposal to repower the existing Kilgarvan I and Kilgarvan II wind farms.

This will replace 28 turbines at existing wind farms, totalling 77.5 MW, with up to 11 more modern machines.

The site is located in Co. Kerry, approximately 7km north-east of Kilgarvan village and approximately 7.5km west of Coolea, Co. Cork.

default
Owenreagh/Craignagapple Repower

Perigus Energy is developing a new wind energy proposal to repower the Owenreagh I & II Wind Farms which have been operational since 1997 and 2008 respectively, and to modify and extend the consented Craignagapple Wind Farm. 

With 14 wind turbines, this wind energy proposal would increase the total installed capacity across Owenreagh I & II Wind Farms and the consented turbines at Craignagapple from 24 MW to somewhere between 63 MW and 67 MW.

Contact Us

If you have any queries relating to any of our projects – operational, in development or in construction – you can speak to a member of our team